Data centres Β· Essex

Nscale Loughton AI Campus

In planning

Nscale announced 50 MW of AI capacity, with a potential 90 MW power allocation. Its 2027 delivery target is a developer target and depends on grid availability. Announced compute capacity does not establish a live operating campus.

Sources reviewed 2026-10-08 Β· Nscale

Project facts

StatusIn planning
Developer / operatorNscale
RegionEssex
CountryEngland
Published rating50 MW
Rating definitionIT capacity
Connection / routeLoughton; grid energisation timetable requires confirmation
Delivery target2027 (developer target; subject to change)

Announced development. October 2026 reporting raises connection-timing concerns; no operational claim is made here.

Electricity demand and supply

IT capacity50 MW
Grid connection capacity90 MW
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Nscale capacity and developer target
    Reviewed 2026-10-08
  2. 3 October 2026 report on grid timing
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.