Project facts
| Status | Consented |
|---|---|
| Developer / operator | Equinix |
| Region | Hertfordshire |
| Country | England |
| Published rating | Not published |
| Rating definition | 400 MVA reservation |
| Connection / route | Elstree / Letchmore Heath connection described by the previous developer |
| Delivery target | Not verified in this profile |
Electricity demand and supply
| IT capacity | Not published |
|---|---|
| Grid connection capacity | Not published |
| Apparent power reservation / substation rating | 400 MVA |
| Measured average electricity demand | Not published |
| Published annual electricity consumption | Not published |
| Power usage effectiveness (PUE) | Not published |
Where its electricity comes from
Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.
Cooling, water and backup power
Cooling and water-use figures have not been independently confirmed.
Backup capacity and fuel are not quantified in this profile.
Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.
Project location
The exact site coordinate has not been confirmed. The map is for geographical context; consult the linked project sources for current plans.
Loading OpenStreetMapβ¦
The map shows geographical context only. No unverified site pin is displayed.
Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2βs additional outlines and route layers are explicitly identified in the developerβs map data.
Sources and review date
- Ownership change
Reviewed 2026-10-08 - Planning approval and 400 MVA reservation
Reviewed 2026-10-08
How Octary distinguishes proposals, published ratings and live measurements