Operating

VIRTUS publishes 112.5 MW of IT capacity for Stockley Park. Cooling and other facility services require electricity in addition to IT load. Actual occupation and annual metered consumption are not disclosed by this capacity figure.

Sources reviewed 2026-10-08 Β· VIRTUS

Project facts

StatusOperating
Developer / operatorVIRTUS
RegionGreater London
CountryEngland
Published rating112.5 MW
Rating definitionIT capacity
Connection / routeStockley Park, west London
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacity112.5 MW
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

The operator’s campus specification describes chilled-water cooling. Building-specific liquid-cooling provision and measured annual water use require separate verification.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

Published facility or mapped building location. A location point is not a site boundary or a verified visitor entrance.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. VIRTUS project information
    Reviewed 2026-10-08
  2. Campus technical specification
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.